Press releases 2011

2011 Third Quarter Financial Information

10/27/11

Paris, October 27, 2011 – Nexans today announced 2011 third quarter sales of 1,711 million euros (at current non-ferrous metal prices), or 1,127 million euros at constant non-ferrous metal prices*, which corresponds to organic growth of 3.9%**.

More...

Nexans wins major power cable contract for Petrofac’s Turkmenistan gas field project

Nexans has been awarded a major contract by Petrofac, the international provider of facilities solutions to the oil & gas production and processing industries, to supply specialized low voltage (LV) cables for a gas field development project in Turkmenistan.

More...

Publication of the 2011 half-year financial report

8/9/11

Document available online.

More...

2011 First Half-Year Results

7/27/11

Confirmed strong business upturn, improvement of the operating margin

More...

Nexans signs agreement with the Shandong Yanggu Cables Group in China to acquire a majority stake in its power cable business

6/21/11

Nexans announced the signing of an agreement with the Shandong Yanggu Cable Group (“Shandong Yanggu”) to create a joint venture based on Shandong Yanggu’s power cable business in China.

More...

Nexans’ Shareholders’ Meeting: adoption of all resolutions proposed to vote

5/31/11

The Nexans Mixed Shareholders' Meeting chaired by Frédéric Vincent, Chairman and CEO, was held on May 31, 2011 at the quai Branly museum in Paris.

More...

Mixed Shareholders’ Meeting of May 31st, 2011 - Outlook for first half 2011 and confirmation of annual targets

5/31/11

The Group will present the outlook for first half 2011 at the Mixed Shareholders’ Meeting that will be held today at 3:00 p.m. at the musée du quai Branly in Paris (France). The meeting will be chaired by Frédéric Vincent, Chairman and CEO.

More...

Nexans provides NG² with specially engineered cable for innovative PLUG shoreside power system

Nexans is supplying specially designed power cables to NG² for its innovative PLUG shoreside power system that makes medium-voltage power connections between shore and ship a pushbutton operation.

More...

Nexans wins a 20 million euro DEH system contract for Statoil’s new Fossekall Dompap oil and gas field on the Norwegian Continental Shelf

Nexans has been awarded a 20 million euro contract by Statoil to design and manufacture the direct electrical heating (DEH) system for the subsea pipelines serving the new Fossekall Dompap oil and gas field on the Norwegian Continental Shelf.

More...

2011 First Quarter Financial Information

4/27/11

Paris, April 27, 2011 – Nexans today announced 2011 first quarter sales of 1,754 million euros.

More...

Nexans’ 2010 Registration document - Mixed Shareholders’ Meeting of May 31st, 2011

4/20/11

Paris, April 20, 2011 – Nexans’ 2010 Registration document has been registered with the AMF (Autorité des Marchés Financiers) on April 19, 2011.  Nexans Mixed Shareholders’ Meeting will be held on Tuesday, May 31st, 2011 at 3.00 pm in the Claude Levi-Strauss theatre of the quai Branly museum.

More...

Nexans MOTIONLINE® cables to provide flexible and reliable solutions for KUKA’s industrial robots

3/15/11

Nexans has been awarded a Euro 1.6 million contract by the German company KUKA Roboter GmbH, one of the leading robot producers worldwide to supply its specialized MOTIONLINE® robotic cables for use in the construction of sophisticated 3D industrial robots.

More...

2010 Full-Year Results

2/14/11

Paris, February 14, 2011 – The Nexans Board of Directors chaired by Frédéric Vincent, which met on February 11, 2011, has approved the accounts for 2010.

More...

Nexans provides specialized trenching service for Baltic 1 offshore wind farm subsea power export cables

1/25/11

Nexans has been called in by EnBW (Energie Baden-Wurttemberg) to use its specialized Capjet trenching system to protect the HV (high voltage) subsea power export cables for Baltic 1, Germany’s first commercial offshore wind farm.

More...

Nexans completes multi-million Euros power cable contract for Ras Laffan Port Expansion project in Qatar

1/19/11

Nexans has successfully completed a multi-million Euros, two-year, contract, for CCC based in Abu Dhabi, to supply power cables for the Ras Laffan Port Expansion project in Qatar.

More...

Nexans wins a major contract for submarine fibre optic cables under the Mediterranean Sea

1/13/11

Nexans has been awarded a major contract by the Chinese company Huawei Marine Networks Co Ltd to supply around 440 km of submarine fibre optic cable for the high profile communications project – the Libya Silphium link across the Mediterranean Sea.

More...

Nexans wins 87 million Euro contract for Skagerrak 4 subsea HVDC power cable between Denmark and Norway

1/7/11

Nexans has been awarded an 87 million Euro contract by Energinet and Statnett, the state-owned Transmission Systems Operators (TSOs) in Denmark and Norway, to deliver the subsea power cable for Skagerrak 4 (SK 4), the fourth HVDC power interconnector between the two countries.

More...